Whenever there's a pitch change which results in a board "lump", we install sheet metal in order to provide a solid base and smooth transition.
Description
:
Whenever encountering a "pitch change", we install some sort of steel valley metal accross the width, as/if needed to smooth out transition lumps or fill voids so that the shingles are resting on a hard smooth surface.